2.3 Planning and Environmental Considerations
Planning
2.3.1 Planning focuses primarily on whether the development itself is an acceptable use of the land rather than on the control of the processes or substances involved. The planning process will regulate the location of the development, in order to avoid or minimise adverse effects on people, the use of land and the environment. It should not duplicate other statutory controls or be used to achieve objectives relating to other legislation.
2.3.2 Planning decisions must be made on the basis that the pollution control regimes will be properly applied and enforced. Planning is not an appropriate means of regulating the detailed characteristics of potentially polluting waste management activities. However, matters relevant to a pollution control authorisation or licence may be material planning considerations.
Pollution Control
2.3.3 The pollution control regime is concerned with the control and regulation of proposed operations and processes and with their day-to-day operation. The objective is to ensure that the waste is disposed of or treated without endangering human health or causing harm to the environment.
2.3.4 Integrated Pollution Prevention and Control (IPPC) is a regulatory system that employs an integrated approach to control the environmental impacts of certain industrial activities. Guidance is available on the DAERA website where it refers to Environmental Permitting Regulations (EPR) rather than IPPC and relates to industry activity including landfill, land spreading, waste incineration, waste recovery and waste treatment. There is also a link to a series of Environmental Permitting technical guidance available from the Environment Agency which outlines how to comply with the Environmental Permit for each activity.
Environmental Considerations
2.3.5 Environmental Impact Assessment (EIA) is a method of ensuring that the likely effects of new development on the environment are fully understood and taken into account before planning permission is given for the development to proceed. The Planning (Environmental Impact Assessment) Regulations (Northern Ireland) 2017 set out a range of developments within two Schedules – 1 and 2 that respectively will require or are likely to require environmental impact assessment. It is mandatory for all proposals which fall within Schedule 1 to submit an Environmental Statement. Under the terms of Schedule 2 the need for an EIA is determined for a proposal on the basis of a screening process.
2.3.6 Further advice on environmental protection, screening and Environmental Impact Assessment is contained in Development Control Advice Note 10 which can be found under the Planning Guidance section of the Department for Infrastructure (DfI) Planning website. Pre-application discussion with the Council will address whether a full EIA is required following consideration of the sensitivity of the receiving environment, including adjacent land uses and potential regulation.
Waste Management Licence
2.3.7 A Waste Management Licence is required under the Waste and Contaminated Land (Northern Ireland) Order 1997 and the Waste Management Licensing Regulations (Northern Ireland) 2003 if you deposit, keep, treat or dispose of waste. A licence may have specific conditions attached to it, depending on the type of waste and it is dealt with and authorised by the Northern Ireland Environment Agency. Planning permission is required before a new waste management licence is granted. Further details on the licence process can be found on the General guidance for applying for a waste management licence on the DAERA website.
Planning Conditions
2.3.8 When planning permission is given for a waste management facility, the Council may impose conditions or negotiate agreements in order to address particular environmental concerns. Where appropriate, the Council may attach a range of conditions to planning approvals in relation to the following issues:
2.3.9 This is not an exhaustive list and other considerations may apply based on site-specific circumstances. It should be noted that where such issues cannot be satisfactorily addressed through mitigating measures, permission is unlikely to be granted.
Developer Contributions
2.3.10 Developer Contributions are normally secured by way of a planning agreement provided for in Section 76 of the Planning Act (NI) 2011. For details of the waste-related Section 76 Planning Obligations for new developments, refer to the Belfast City Council Planning Developer Contributions Framework. The Framework should be read in conjunction with the Strategic Planning Policy Statement for Northern Ireland (SPPS).
2.3.11 The Council will consider the use of developer contributions to ensure that new development is supported by sustainable waste infrastructure and to help mitigate the environmental effects of new waste management facilities. The need for developer contributions to either support new development or manage the environmental effects of new waste management facilities will be assessed in consultation with the Council’s Waste Management Team. It is expected that any measures required to mitigate or compensate any adverse environmental effects resulting from waste management facilities are secured as part of the planning permission and will be assessed on a case-by-case basis.