3.3 Policy W4 – Land Improvement
Policy W4 - Land Improvement
Planning permission will be granted for the disposal of inert waste by its deposition on land where it is demonstrated that it will result in land improvement and all of the following criteria are met:
a. It will not result in an unacceptable adverse environmental impact that cannot be prevented or appropriately controlled by mitigating measures (see Policy W1);
b. It can be demonstrated that there is a local need for the development;
c. Only the minimum quantity of fill necessary to achieve the proposed improvement shall be deposited; and
d. Detailed measures are included for the appropriate restoration and aftercare of sites that will help to enhance biodiversity
3.3.1 The following sections set out the circumstances when agricultural land improvement does not require express planning permission.
3.3.2 Under the Planning (General Permitted Development) Order (Northern Ireland) 2015, a planning application is not required for the carrying out, on agricultural land comprised in an agricultural unit, any excavation or engineering operations reasonably necessary for the purposes of agriculture. Agricultural land improvement can fall into this category provided the Council is satisfied that the following conditions are met:
- the development is on an agricultural land holding of at least 0.5 hectares in area; and
- no part of the development is within 24 metres from the nearest part of a special road, or within 24 metres of the middle of a trunk or a first or second-class road or 9 metres from the middle of other classes of road.
3.3.3 In deciding whether or not such land improvement is reasonably necessary for the purposes of agriculture or amounts to a separate land use activity in its own right, the Council will take the following considerations into account:
- whether the amount of material brought onto the site is the minimum required to achieve the needed improvement;
- the nature of the material being deposited;
- the extent, scale and duration of the operations involved;
- the quality of the agricultural land being filled; and
- whether the landowner is a farmer actively engaged in farming operations on the holding.
3.3.4 The Council will consider the circumstances of each case to ensure that the proposed development is required for genuine agricultural purposes. Where a planning exemption is made, an application should still be made to DAERA under the waste management licensing regulations to register an exempt activity for the purpose of reclamation, restoration or improvement of land which has been subject to industrial or other man-made development where the use to which that land could be put would be improved by the spreading of waste, as would be the case for land improvement. This is referred to as a ‘Paragraph 11 exemption’ application.
3.3.5 The activity and the quantity of waste used, must be carried out in accordance with any planning permission (where such permission is required) or planning exemption. The relevant planning permission, relevant planning drawings and cross-sections must be submitted with the Paragraph 11 exemption application. The waste must be spread to a depth not exceeding the lesser of 2 metres or the final cross-sections shown on any plan or drawings required to be submitted in support of the exemption application. The waste spread must not exceed 20,000 cubic metres per hectare.