3.2 Urban repair and connectivity
Policy DES2: Masterplanning approach for major development
Planning permission will be granted for major development where it accords with the following masterplanning principles:
(b) Promote opportunities for urban repair and greater connectivity to neighbouring areas by minimising or mitigating physical barriers that create undue effort or separation, informed by feedback from existing communities.
3.2.1 Areas of the city that have experienced post-industrial decline or have suffered from a lack of investment can present opportunities for new regeneration projects. Where the opportunity exists, new development proposals should seek to repair and reknit the urban environment while creating new connections that provide welcoming, well designed, and sustainable environments. Adopting a masterplanning approach to such areas should look beyond the red lines of the site and consider the wider impact of new development. Major development should seek to realise opportunities to enhance the urban context, by way of linking or creating green spaces, cycle lanes, leafy shaded places for people to meet, rest, talk, play, prioritising the pedestrian and cyclist.
3.2.2 Urban repair can also help alleviate those sections of the city which have suffered from poor transport infrastructure and a legacy of unsympathetic development which has resulted in physical barriers that restrict movement and create undue effort or separation. Establishing legible and well-connected layouts is an essential design consideration. It is imperative that new interventions enhance connectivity not only within the site but beyond to neighbouring areas.
3.2.3 Balancing the needs of access and movement while creating a high-quality development requires innovation and creativity. It is important that active modes of transport are considered from the outset to avoid the dominance of vehicular movement that has impacted many parts of our city.
3.2.4 This is of particular importance when developing brownfield sites within the city which may have been left underdeveloped due to the lack of connectivity. Existing and historic context and levels of connectivity should provide the starting point from which to formulate new patterns of development. Research to understand what the previous function and use of the brownfield site was, may help to develop and inform desire lines and linkages.
3.2.5 Poor connectivity will limit the success of the masterplan irrespective of the quality of development proposed and as such development proposals that fail to address these issues will not be considered acceptable. Greenways and green routes are one approach that could be widely implemented across the city. safeguarding appropriate land within masterplans that could futureproof the development of green connections.
3.2.6 Infrastructure, utility connections and site conditions should also be considered at an early stage as these can pose constraints that can be difficult to mitigate further within the development and design process.
Image 10: Lagan Weir
Pedestrian bridge connecting the east of the city to the city centre.

Addressing physical barriers
3.2.7 One of the main contributors which constrains permeability and movement across the city is the legacy of strategic road infrastructure and the degree of disconnect that this has caused at a local level, an issue which is readily apparent along the northern edge of the city centre. The extent of this issue is such that the term ‘shatterzone’ has been coined to describe the damage caused to the urban environment by interventions such as motorways and feeder routes which were carved through some of the city’s more historic and tightly knitted urban areas to cater for an increasingly motorised society.
3.2.8 A contentious issue and one very unique to Belfast is the profound and lasting impact that the Troubles have had on our urban environment in relation to physical barriers. The most recognisable of these include ‘Peace Walls’ and interfaces which define boundaries along community lines. Any proposal to remove structures of significance relating to the Troubles should be given appropriate consideration in terms of their heritage impact and their impact they have had on our society and urban form. Such structures, though not designated can have heritage significance and should be accompanied by a Heritage Impact Assessment.
3.2.9 On a more localised level challenges also exist in the form of poorly connected residential areas, where points of access were restricted and the use of cul-de-sacs widespread in order to address concerns of security forces. These challenges also extend to those less obvious barriers to movement such as shopping centres, industrial estates and swathes of ‘left over’ open space, all of which have been used in various guises to reinforce and define boundaries between communities.
3.2.10 In the layout of new masterplans, every opportunity should be taken to positively effect change by alleviating such physical barriers. Where appropriate the opportunity should be taken to remove or redesign where such elements are considered redundant or superfluous. Where structures may have a local or historic significance, applications should outline how they can be represented or changed to retain an appreciation of the history of the site, while improving connectivity. Here priority should be allotted to pedestrian and cycle movements with the aim of re-stitching fragmented areas of the city and promote walkable neighbourhoods. Issues such as hierarchy of routes, street design, public realm, public transport network, service provision, vehicle access points and parking need to be appropriately balanced and should be given due consideration at the earliest stage of the masterplan development.
3.2.11 Utilising a masterplanning approach to site assembly also increases the potential to integrate vehicular movement within the overall design. However these issues should not be considered technical challenges that fall solely within the remit of road/transport engineers, but should instead be considered collaboratively by the wider masterplanning team and affected communities with good placemaking principles at the forefront.
3.2.12 The consultation process for major development is critical in obtaining an understanding of the main areas of concern facing communities, but also is an opportunity to gain community support for new proposals. Establishing these connections with the community early on within the design process and taking into account the cumulative impact of the proposal should be considered. This will be evident long after the development is completed.
Case Study 1: Connswater Community Greenway
A 9km linear park through east Belfast following the course of the Connswater, Knock and Loop Rivers, connecting open and green spaces. The multipurpose greenway not only provides an attractive, safe and accessible parkland for leisure, recreation, community events and activities but also includes an £11 million flood alleviation scheme that has helped reduced flooding to 1700 properties. Eastside partnership along with BCC delivered the scheme that underwent an extensive public consultation and engagement process.