5.8 Civil aviation and telecommunications
Policy DES3: Tall buildings
Planning permission will be granted for tall buildings, defined as any building 35m above ordnance datum (AOD) or taller or those which are significantly higher than their surroundings, where they:
- Comply with all necessary civil aviation requirements and not interfere, to an unacceptable degree, with telecommunications, television and radio transmission networks.
5.8.1 The location of a tall building or structure may present a potential hazard to aviation. By virtue of their location and nature, tall buildings and structures may need to be lit if they are considered a significant navigational hazard. Consultation will therefore be required with the Civic Aviation Authority to seek views with respect to tall buildings and structures.
5.8.2 Tall buildings and structures can also affect reception of wireless services, including domestic television reception. Consideration of the impact of a new development on wireless services should therefore be undertaken during the early design and planning stages. An assessment of any consequential impact that the tall building may have on wireless services should therefore be taken before development takes place and allow for any mitigation measures at planning stage. Consultation may therefore be required with Ofcom as the regulator for UK communications industries to seek views in this regard.