3.1 Holistic approach

Policy DES2: Masterplanning approach for major development

Planning permission will be granted for major development where it accords with the following masterplanning principles:

(a) Adopt a holistic approach to site assembly, layout and design that is mindful of adjacent sites, where suitable for redevelopment, while avoiding prejudice to future development potential and or quality where development is of a significant scale and prominence.

3.1.1 How well a place is understood will be one of the most important aspects of how successful a scheme will be. Applicants will need to undertake and communicate this understanding of a sites context clearly and simply, demonstrating that the design has undergone a thorough site analysis and contextual review with consideration given in the initial stages to a holistic approach to site assembly. This should not be limited to current context, but also include and analysis of the historic context for example former functions and uses of the site through time and how this has influenced the place as we know it today.

3.1.2 Prior to setting out an overarching vision and design principles, consideration should be given in the first instance to the unique characteristics of the site including the availability of any adjacent plots of land that may or may not lie outside the applicant’s ownership. Considering such plots from the outset can result in a more meaningful and robust site analysis and in turn a more legible masterplan particularly when in doing so helps to regularise restrictive or challenging boundaries. This approach is not only more sustainable but can also help to futureproof adjacent sites and avoid prejudicing their development in future. 

3.1.3 Applicants are therefore encouraged, where appropriate, to consult adjacent landowners early on to ascertain the benefits that a joined up approach may bring to the masterplanning process and the wider aspirations of the area. While this can sometimes prove challenging, efforts should be made to demonstrate that meaningful engagement has taken place with adjacent landowners.

3.1.4 It is important that when adopting a masterplanning approach for major developments that the applicant considers the masterplan as a dynamic document that incorporates a degree of flexibility and does not set rigid or overly prescriptive design criteria for the future development and design of the proposal. The scope of design criteria can range from a ‘Design Statement’ which outlines broad design parameters that should be applied across the site, to a more prescriptive ‘Design Code’ that sets out rules or code for individual plots within the scheme (see paragraphs 3.1.10 – 3.1.16). In either case, the aim is to establish the context and aspirations for the site that can be adapted over time through a phased approached with a degree of flexibility. Clearly identifiable phases within a scheme can help accommodate changing project conditions, demands and expectations. It is important that the initial vision is not lost or diluted through subsequent design iterations.

Site assembly

3.1.5 Successful places strike a harmonious balance between connections, spaces and buildings. Plot sizes, the shapes of buildings including their scale height and massing are factors to be considered in establishing this balance, however it cannot be one single determining factor. From an urban design viewpoint, open spaces and areas surrounding buildings and plots are equally important if not more important than the as the buildings themselves and need to be considered from the outset with regards to their intended use. The same can be said if too much focus is placed on open space provision which can potentially lead to rigid plot widths and can overly restrict architects when designing buildings.

3.1.6 By utilising a masterplanning approach several varying proposals can be tested. Such tests may include;

  • Where developments occur in areas where archaeological remains of the city’s historic environments are likely to be encountered, masterplans should consider how this work, as it progresses can be promoted to surrounding communities, allowing engagement with their past and achieving public benefit.
  • Does the plot make sense in relation to likely sizes, shapes and uses of buildings? For example, some plots may be too big for a single building or too small to provide sufficient amenity space. This should be assessed by drawings at an appropriate scale, in section and plan. The appropriate block size may depend on the intended use (if known) which can determine the likely scale of the building, need for amenity space and associated service provision;
  • Do the proposed block sizes, width and form relate to the historic context and grain of the site, so that new development is responsive to the character of an area.
  • In cases where the intended use is not yet established it is important that the blocks and plots contain a degree of flexibility so as not to overly restrict their future use;
  • What levels of permeability are provided for pedestrians, cyclists, public transport and other vehicles? Are pedestrians and cyclists allotted adequate priority throughout the site?;
  • How will the built form affect microclimates? Can site conditions be utilised to increase energy efficiencies?

3.1.7 In responding to these queries, the level of detail provided should allow for greater certainty and provide the basis for a structured masterplan approach which demonstrates;

  • How streets, squares and public open spaces are connected.
  • The hierarchy of building scale, height and massing.
  • The relationship between buildings and spaces, clearly defining public and private areas and any impact on amenity.
  • The range of uses and intended activities.
  • The levels of movement through the site including desire lines and wider cycling and walking networks focusing on pedestrians and active travel with adequate provision made for public transport, vehicular movement and service access.
  • All service provision requirements for utilities, including water, gas, waste etc.
  • A greater understanding of how the proposal will connect and integrate with its wider context including surrounding communities and natural environment.

3.1.8 With regards to how the proposal connects and integrates with its wider context, cognisance should be given to any existing published strategies that may have a bearing on the site. These may include masterplans and frameworks produced by the council and/or statutory agencies such as the Belfast City Centre Regeneration and Investment Strategy, Inner North West Masterplan, East Bank Development Strategy, Belfast Entries Project and the Green and Blue Infrastructure Plan to ensure compatibility and alignment with any agreed visions, aims and objectives. Consideration should also be given to the transport/road network, any relevant Transport Assessment and DfI's Strategic Transport Master Plans.

3.1.9 Applicants are encouraged to demonstrate the masterplanning approach process using 3D model imagery, and where appropriate utilise VUCITY.

Images 2 to 5: Inner North West (INW) Action Plan Area (contextual analysis)
The images illustrate some of the contextual analysis undertaken during a masterplanning approach for future development within the north west area of the city centre. Analysis included examining historical mapping, identifying heritage assets and understanding the extent of underutilised sites and those sites under public ownership.

c4af59b880838df42b1424ce25f34ffa_1

2c6d5755e0a255467d2aef5f763724de

4c1676b4950d4424aa51eb126a89cc3c

Yellow area: Listed buildings
Blue area: Buildings of local significance
Red line: City Centre Conservation Area
Blue line: Cathedral Conservation Area

9d99f495e386ca0a65bd2df1225897ff

Blue area: Underutilised sites
Yellow area: Surface car parking
Green area: Land under public ownership
Red line: City Centre Conservation Area
Blue line: Cathedral Conservation Area

 

Design statements

3.1.10 Design Statements can be an effective tool in prescribing broad design parameters for small to medium sized sites to illustrate the thought processes underpinning the design. They can be used as a means of explaining the design concept for the proposal, beginning with the basic preposition for the site and illustrating by way of clear and coherent masterplanning principles how the scheme responds to policy contained within the Local Development Plan.

3.1.11 The Design Statement therefore establishes the basis for a structured and reasoned approach to the design grounded in analysis conclusions drawn from local context. It should be written in a way that avoids jargon to ensure that it can be easily interpreted and understood by a wide audience of readers including members of the public, community representatives, elected representatives and council officers.

Design codes

3.1.12 Once masterplanning principles are formulated, further detail can be set out in the form of Design Code depending on the size and complexities associated with the site. The level of detail provided can be broad or provided on a plot by plot basis, however it should underpin the key masterplanning/urban design principles that are being sought as well as reflecting the overall vision for the area. Applicants are advised to seek clarity with the council at an early stage, preferably during PAD, as to whether their site would require a 'Design Statement' or in the case of larger more complex sites a 'Design Code'.

3.1.13 Design Codes are useful tools within the application process, particularly for larger more complex sites and ones with longer term implementation strategies that could see the client/developer change throughout the time period of the proposal. The Design Code sets out rules or code for the design of new development across the full extent of the scheme and represents an illustrative interpretation of the broader masterplanning/urban design principles illustrating the intent for development plots contained within the masterplan. They are a more detailed expression of the illustrative Masterplan and for council represents a valuable tool in retaining quality within a scheme and as a key point of reference in determining future reserved matters applications as the masterplan is brought forward.

3.1.14 Information within the Design Code should provide enough detail to secure the intent of the illustrative scheme while affording a degree of flexibility to future designers in considering what is deemed appropriate. Information would typically relate to proposed use, layout, scale, open space, plant/servicing, articulation of elevations, materials and where appropriate the relationship between buildings and any new extension. It should also include a palette for materials, public realm, street furniture and space standards for residential uses, yet allow a degree of flexibility for architectural expression and innovation.

Image 6: Sirocco Design Code (Henning Larsen Architects) Design code covered aspects such as optimal daylight conditions within residential courtyards.

image6

3.1.15 This provides the council with a strong, evidence-based framework document to help guide and inform the roll-out of development across the masterplan, irrespective of which developer/applicant comes forward to realise particular sites.

3.1.16 Particular care will be necessary in preparing layout proposals on sloping sites in order to minimise the impact of differences in level between adjoining properties, existing or proposed. The use of prominent retaining walls within and at the margins of sloping sites will be unacceptable. Where changes in ground level between buildings are unavoidable the Council will generally expect these to be accommodated by the use of planted banks. It may be appropriate to consider the use of bespoke/specialist house designs which respect topography, such as split level dwellings. In all cases it will need to be demonstrated that the proposals will avoid significant overshadowing, overlooking and loss of privacy.

Images 7 to 9: Inner North West (INW) Action Plan Area. The INW Masterplan proposes a reimagined Smithfield Market as a new city square defined by development with active frontages. Cross-section diagrams help to illustrate one way of designing new homes above active ground floors with raised internal communal courtyards.

fce5f065ee1e843767f7f50216ce5a16

  1. Market
  2. Landscaped podium
  3. Private roof terrace
  4. Landscaped public realm
  5. Duplex
  6. Resident car parking
  7. Bike store
  8. Castle Court
Read aloud icon Read aloud